Drawer LTAD 237
Contains 251 Results:
Boiler House, 1952 July 11
Plan at firing floor level. Plan above firing floor level.
Boiler House, 1952 July 11
Schedule of piers and footings. Schedule of beams and reinforcement. Typical pier and footing sections.
Reconstruction of Thornleigh., 1960 August 24
Plan of north stair footings and pit. North elevation of north stair. Plan of tower and stringers, north elevation of tower and stringers. Detail of roof balustrade. Detail of pit reinforcement, section A-A, tower leg base plate, south elevation of south stair.
Office block, undated
Sketch of 1 level of a habitable and rentable areas.
Sub structure: details of retaining walls and footings, 1957 April
Footing Plan. South, west, east elevations, elevation A-A. Details of Ground beams, details GB6 -GB10, details GB1-GB5. Piers C1-C5 and C10-C14. Details of encased columns C10-C17. Detail at top south retaining wall. Encased Beam F1-F8. Typical pier and footing. Schedule of footings and piers. General notes.
Sub structure: details of structural steel, 1957 April
Steel marking plan, general notes, details of frames F1 to F8, column C9.
Structural drawing, 1957 July
Detail A, frame 3 off, plan, detail B, detail C.
Electrical plan, 1957 July
Electrical plan. Schedule of light fittings.