Extensions to Sea House and Entry Gate, Lot 3, Caraar Creek Lane, Mornington, 2002 August-2003 May
File — drawer: LTAD 195 (PART 2) DRAWER 33.18.8
Scope and contents
Working drawings, Aug 2002-May 2003.
Dates
- 2002 August-2003 May
Creator
- McIntyre, McIntyre & Partners (Architect, Organization)
Extent
5 architectural drawings : ink on tracing paper
General note
Drawn: GR/PC, SIN/PC, GR/KM, GR, GR.
Creator
- McIntyre, McIntyre & Partners (Architect, Organization)
- McIntyre Partnership Pty Ltd (Architect, Organization)
- drawer: LTAD 195 (PART 2) DRAWER 33.18.8 (Graphic materials)
Repository details
Part of the Pictures Collection, State Library Victoria Repository
Contact:
328 Swanston Street
Melbourne Victoria 3000 Australia
03 8664 7002
328 Swanston Street
Melbourne Victoria 3000 Australia
03 8664 7002